Asus ESC4000 G3 Series User Manual page 33

2u rackmount server
Table of Contents

Advertisement

2.
Align the system such that the socket box is facing toward you and the triangle mark is
on the top-right position.
3.
Press down the load lever with your thumb (A), move it to the right until it is released
from the retention tab (B), then gently lift the load lever (C).
To prevent damage to the socket pins, do not remove the PnP cap unless you are installing
a CPU.
Load lever
ASUS ESC4000 G3/G3S Series
2-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Esc4000 g3s series

Table of Contents