OPERATING MODES / MAINTENANCE

Temperature setting

Table 4 Operating modes (operation with outdoor temperature sensor)
Operation with
Room control module RRG
Heating circuit module
2)
HKM
with timer
Heating control module
HKM with room thermostat or RTW (HKM heater
1) On mixed heating systems (application example 2) the room temperature setting applies for the pump and mixer
heating circuit
2) On separate heating systems (application example 3) the room temperature setting on the heating circuit module
HKM applies for the pump heating circuit The room and hot-water temperature setting on the room control
module RRG applies for the mixer heating circuit
Boiler control via 0–10 V DC
input signal (CISP clip-in relay
module)
Cleaning
Condensate siphon
Removing gas burner
14
There are various setting possibilities for the temperature, see table 4.
Room temperature
setting
1)
On room control module RRG On room control module RRG On room control module RRG
On heating circuit module HKM On heating circuit module HKM On EMS or DSU timer
heater control
On room thermostat RAV, RTD On heating circuit module HKM On room thermostat
control must be set
to max. position!)
The boiler is provides with an input for a 0–10 V DC signal to control the
boiler temperature or the boiler output directly.
– To activate this function, set param. 618 to 4 or 5 (see table 7 for details)
– For a proper use of this input, disconnect all external controls from the
boiler (e.g. room control RRG) and set the heating curves to "1"
(parameters 532 and 533, see tab. 7).
Note: If any other relay module (e.g. CIST, CIR, CITF) is installed, the
CISP must be taken out!
It is essential to clean the boiler, heat exchanger and burner once a year by
an approved gas installer. The need to clean the boiler and burner can also
be indicated by a CO emission value that exceeds 200 ppm. Before starting
work, the gas valve must be closed and the electricity to the boiler turned
off.
The condensate siphon should be cleaned every one or two years. To do
this the upper screw connection on the siphon is loosened and the siphon is
pulled away downwards. Remove the siphon completely with hose from
the boiler, disconnect and rinse through with clean water. Re-assemble the
siphon in reverse order.
Remove the gas burner before cleaning the heating surfaces. To do this
disconnect the electrical wiring to the fan from the terminals and pull the
hose of the air pressure from the fan.
G Unscrew the screw connection of the gas supply pipe in front of the gas
solenoid.
G Pull off electrical wires and plugs from the gas solenoid, gas pressure
switch, ignition electrodes as well as the ionization electrode
G Loosen securing nuts of the burner (SW13) and pull out the burner
complete with mixing chamber, fan and gas solenoid forwards
G Clean burner pipes with soft brush.
Hot-water temperature
setting
hot-water control
hot-water control
Heating program
RAV, RTD or RTW

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec plus 90Ec plus 120Ec plus 160Ec plus 200Ec plus 250

Table of Contents