Connection Of The Drain Hose - LG LAN126HNP Manual

Universal air conditioner
Table of Contents

Advertisement

Flaring work and connection of piping
Connecting the piping with the indoor unit
and drain hose with drain pipe
1. Align the center of the pipings and sufficiently tighten
the flare nut by hand.
2. Tighten the flare nut with a wrench.
Outside diameter
mm
inch
Ø6.35
1/4
Ø9.52
3/8
Ø12.7
1/2
3. When extending the drain hose at the indoor unit,
install the drain pipe.
Wrap the insulation material around the
connecting portion.
1. Overlap the connection pipe insulation material and
the indoor unit pipe insulation material. Bind them
together with vinyl tape so that there may be no gap.
2. Wrap the area which accommodates the rear piping
housing section with vinyl tape.
3. Bundle the piping and drain hose together by
wrapping them with vinyl tape over the range within
which they fit into the rear piping housing section.
Copyright ©2010 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Torque
kgf . cm
180~250
340~420
550~660
- 22 -
Indoor unit tubing
Flare nut
Torque wrench
Indoor unit tubing
Drain pipe
Vinyl tape(narrow)
Adhesive
Plastic bands Insulation material
Connection
pipe
Vinyl tape
Wrap with vinyl tape
(wide)
Connecting cable
Vinyl tape(narrow)
Wrap with vinyl tape
Pipe
Vinyl tape(wide)
Drain hose
LGE Internal Use Only
Pipings
Spanner (fixed)
Flare nut
Connection pipe
Indoor unit drain hose
Indoor
unit pipe
Pipe

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents