FLUE TERMINAL LOCATION

The flue terminal should be positioned away from
flammable materials.
WARNING
The Aspiration RHFE 750ETR flue terminal is 'Fan Assisted'
with a maximum input of 32 MJ/h
Ensure that the location of the flue terminal can comply
with the requirements of AS 5601 2004 Clause 5.13.6.2 and
Fig. 5.3 which is reproduced below.
AS 5601-2004 was current at the time of printing but may have been superseded. It
is the installer's responsibility to ensure that requirements of the current version of
NOTE
AS 5601 are met.
The flue system must be fully assembled and secured in place before the heater is
installed into the enclosure.
IMPORTANT
Rinnai
FLUE INSTALLATION
21
c
Minimum clearance 500 mm to
a
nearest part of roof.
Minimum clearance 25mm to
b
combustible materials.
c
Decktite or lead collar flashing.