10.0 Completion
10.1
Completion
Case Front Panel
1. Hinge the facia panel upwards and refit the
case front panel. Secure them with the screws
previously removed (Fig. 38).
2. Instruct the user in the operation of the boiler
and system, explaining the operational
sequence.
3. Carefully read and complete all sections of
the "Benchmark" Installation, Commissioning
and Service Record Log Book that are relevant
to the appliance and installation. The details of
the Log Book will be required in the event of any
warranty work. The Log Book must be handed
to the user for safe keeping and each
subsequent regular service visit recorded.
4. For IE, it is necessary to complete a
"Declaration of Conformity" to indicate
compliance with I.S. 813. An example of this is
given in I.S. 813 "Domestic Gas Installations". In
addition it is necessary to complete the
"Benchmark" Log Book.
5. Hand over the Users Operating, Installation
and Servicing Instructions and the Log Book,
Facia Panel
Fig. 38
giving advice on the necessity of regular
servicing.
27