7.0 Site Requirements

7.1
1. The boiler may be fitted to any suitable wall
with the flue passing through an outside wall or
roof and discharging to atmosphere in a position
permitting satisfactory removal of combustion
products and providing an adequate air supply.
The boiler should be fitted within the building
unless otherwise protected by a suitable
enclosure i.e. garage or outhouse. (The boiler
may be fitted inside a cupboard-see Section 7.3).
2. If the boiler is sited in an unheated enclosure
then it is recommended to leave the ON/OFF
Selector Switch in the domestic hot water and
780mm
central heating position to give frost protection.
3. If the boiler is fitted in a room containing a bath
or shower reference must be made to the
relevant requirements.
In GB this is the current I.E.E. Wiring Regulations
and Building Regulations.
In IE reference should be made to the current
edition of I.S. 813 "Domestic Gas Installations"
and the current ETCI rules.
4. If the boiler is to be fitted into a building of
timber frame construction then reference must be
made to the current edition of Institute of Gas
Engineers Publication IGE/UP/7 (Gas
Installations in Timber Framed Housing).
7.2
1. A flat vertical area is required for the
installation of the boiler.
2. These dimensions include the necessary
clearances around the boiler for case removal,
spanner access and air movement. Additional
clearances may be required for the passage of
pipes around local obstructions such as joists
running parallel to the front face of the boiler.
Location
Clearances (Figs. 7 & 8)
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Combi instant 105e

Table of Contents