HEATER ENGINE INSTALLATION - ZERO CLEARANCE

ZERO CLEARANCE INSTALLATION OVERVIEW

Read this manual thoroughly and gain a full understanding of the requirements before
undertaking installation.
IMPORTANT
Ensure gas supply to heater is turned off for the first stages of this instruction.
Step 1.
Prepare Site - p.20
Step 2.
Assemble Zero Clearance Box - p.20
Step 3.
Fitting Zero Clearance Box Into Cavity - p.21
Step 4.
Unpack The Heater Engine - p.21
Step 5.
Preparing Heater Engine - p.21
Step 6.
Connect Transition Box to Engine - p.22
Step 7.
Positioning the Heater Engine - p.22
Step 8.
Connect Electrical Supply - p.22

ZERO CLEARANCE INSTALLATION - DETAIL

Step 1. Prepare Site
Ensure the intended enclosure meets the requirements of the dimensions as stipulated in
"ENCLOSURE REQUIREMENTS" on page 14 and that gas and electrical supplies have been
IMPORTANT
prepared in accordance with the dimensions stipulated in "GAS SUPPLY" on page 15 and
"ELECTRICAL SUPPLY" on page 15.
Ensure there are no wall studs, noggins, ceiling joists, wiring or other obstruction within the wall
and or ceiling cavity where the flue is proposed to penetrate.
Step 2. Assemble Zero Clearance Box
Carefully remove the contents from the carton and check to ensure you have all contents as listed on "BEFORE
YOU START" on page 1. If ANY damage is evident or parts are missing DO NOT assemble the zero clearance box
and contact your supplier for advice.
I
D
C
A
Transition Box
assembly used
in step 6.
B
I. Assemble the transition box
box and secure with two pop-rivets (supplied).
Fit the plastic grommet
II. Attach the two side panels
III. Attach top panel
H
(supplied).
Next secure the top panel
Attach base panel
Then secure the base panel
Ensure flue has been installed as per 'Flueing Installation Manual For Rinnai Flamefire Heaters'.
Flue guide rails screws and pop rivets are supplied with Zero Clearance kit, part number R2520.
NOTE
Rinnai Australia
II
E
Guide Rails
M
used in Step 5.
&
with five screws
A
B
into the gas and electrical access hole of back panel
E
to the back panel
&
F
G
to the back panel
aligning the flue outlet hole to the rear and secure with three screws
D
to the side panels
H
to the back panel
I
D
to the side panels
I
Step 9.
Insert Heater Engine Into Fireplace - p.22
Step 10. Connect Flue - p.22
Step 11. Secure Flue - p.22
Step 12. Connecting Gas - p.22
Step 13. Securing The Heater Engine - p.22
Step 14. Leak Testing - p.22
Step 15. Completing Heater Installation - p.22
F
G
D
(supplied)
, then a
and secure with six screws (suppled).
C
with four screws (supplied).
&
G
F
and secure with two screws (supplied).
with four screws (supplied).
&
G
F
20
III
F
I
ttach the guide plate
C
.
D
Slimfire 252 Operation & Installation Manual
H
G
to the transition

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ribf2lSlimfire 252

Table of Contents