Mercury Optimax 115 Service Manual page 91

Direct fuel injection
Hide thumbs Also See for Optimax 115:
Table of Contents

Advertisement

NOTE: To test rectifier assembly, touch POSITIVE (+) lead from ohmmeter to POSITIVE
stud and NEGATIVE (–) lead from ohmmeter to each diode terminal. The ohmmeter
should indicate continuity.
a -
b -
c -
Reverse leads – NEGATIVE lead on POSITIVE stud and POSITIVE lead on each diode
assembly. NO CONTINUITY should be observed. If continuity is observed in both tests,
or NO CONTINUITY is observed in both tests, the rectifier assembly is defective and must
be replaced. Torque rectifier screws to 17 lb-in (1.9 Nm).
a -
b -
c -
IMPORTANT: Depending on the polarity of the ohmmeter, reversed readings may
be obtained – I.E. – CONTINUITY is observed when the NEGATIVE lead touches the
POSITIVE stud and NO CONTINUITY is observed when the POSITIVE lead touches
the POSITIVE stud.
90-855347R1 JANUARY 1999
c
c
Positive Stud
Positive Ohm Lead
Negative Ohm Lead
b
b
a
a
Positive Stud
Negative Ohm Lead
Positive Ohm Lead
CHARGING & STARTING SYSTEM
a
a
b
b
51679
c
c
51679
Page 2B-17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optimax 135Optimax 150Optimax 175

Table of Contents