Roberts Gorden Blackheat BH15UT Installation, Operation & Service Manual page 26

Blackheat vacuum assisted linear, double linear, u-tube, and multi-burner gas fired heating systems
Table of Contents

Advertisement

®
B
I
LACKHEAT
NSTALLATION
Step 6.4.1 Coupling and Tube Assembly (Continued)
Tighten slide bar as shown below.
Correct Slide Bar
dimensions
• Repeat Step 6.4 A - D until all tubes are assembled. See Page 20, Section 6.4.2 shown below.
Step 6.4.2 Coupling and Tube Assembly (Continued)
20 of 75
O
S
M
PERATION AND
ERVICE
ANUAL
Drive slide bar until tight.
End of slide bar should be
within tolerance listed below.
± 50 mm
Incorrect Slide Bar
position
Model
Overall Tube Length (mm)
BH15ST
6,000
BH20ST
9,000
BH25ST/EF
9,000
BH30ST/EF
12,000
BH35ST/EF
12,000
BH40ST/EF
12,000
BH45ST/EF
15,000
BH50ST/EF
15,000
BH55ST
18,000
Number
of Tubes
2
3
3
4
4
4
5
5
6

Advertisement

Table of Contents
loading

Table of Contents