Figure 15: U-Tube, Opposite 45° Tilt; Figure 16: U-Tube, Protective Grille; Figure 17: U-Tube, Venting - Roberts Gorden Blackheat BH15UT Installation, Operation & Service Manual

Blackheat vacuum assisted linear, double linear, u-tube, and multi-burner gas fired heating systems
Table of Contents

Advertisement

NOTE: 1. All dimensions are from the surfaces of all tubes, couplings, tees, elbows and crosses.
FIGURE 15: U-TUBE, OPPOSITE 45° TILT
A
D
B
C

FIGURE 16: U-TUBE, PROTECTIVE GRILLE

A
D
B
C

FIGURE 17: U-TUBE, VENTING

2. Clearances B, C and D can be reduced by 50% after 7500 mm of tubing downstream
from the burner.
3. All measurements are in millimeters.
4. Add 60 mm clearance to uncovered U-tube.
A
200
200
B
1370
1530
C
1500
1650
D
560
560
A
150
150
B
890
970
C
1580
1730
D
760
940
E
1000
1000
F
500
500
SECTION 3: C
200
250
250
1530
1630
1780
1650
1860
1960
560
560
560
150
150
150
970
1020
1170
1730
1910
1980
940
1000
1090
1000
1000
1000
500
500
500
C
LEARANCES TO
OMBUSTIBLES
275
300
300
1830
1880
1930
2040
2110
2160
560
560
560
150
200
200
1220
1270
1380
2050
2110
2210
1150
1200
1300
1000
1000
1000
500
500
500
9 of 75

Advertisement

Table of Contents
loading

Table of Contents