Yamaha WaveRunner VX 700 Service Manual page 78

Table of Contents

Advertisement

POWR
23. Install the fuse box assy. O, and then
tighten the nuts P to the specified
torque.
24. Install the band Q.
O
P
Q
Electrical box nut P:
15 N·m (1.5 kgf·m, 11.1 ft·lb)
25. Install the plastic ties R.
R
26. Connect the multifunction meter couplers
S, and then install the plastic ties T.
T
27. Install the service lid.
28. Connect the positive battery cable, and
then connect the negative battery cable.
29. Coat the battery cable terminals and bat-
tery terminals with water resistance
grease.
5-9
Power unit
T
S

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Waverunner vx 700 f2v

Table of Contents