Removal Of Flame Rod And Spark Plug; Removal Of Outgoing Water Thermistor; Removal Of Heat Exchanger Thermistor; Removal Of Air Intake Thermistor - Rinnai INFINITY 26i Service Manual

Infinity high capacity continuous flow gas hot water system
Hide thumbs Also See for INFINITY 26i:
Table of Contents

Advertisement

Gas Control
9)

Removal of Flame rod and spark plug

a. Remove flame rod terminal and tighten span cord.
b. Remove flame rod and spark plug.
c. Remove of High Tension lead
Infinity REU-V2632FFU / HD200I REU-V2632FFUC
Infinity 26i and HD50i

10) Removal of outgoing water thermistor

a. Remove thermistor fixing screw.
b. Remove 2 pin connection outgoing water thermistor
Heat Exchanger Thermistor

11) Removal of heat exchanger thermistor

a. Remove thermistor holder
b. Remove 2 pin connector

12) Removal of air intake thermistor

a. Remove fan motor
b. Remove 2 pin connector of inlet thermistor
c. Remove inlet thermistor (care with O-ring)
d. Thermistor
- 45 -
Issue 1 - 8/09/03 ©Rinnai

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Infinity hd50i

Table of Contents