Installing The System In A Distribution Rack; Preparing The System And Rack - 3Com SuperStack II Switch 9300 Getting Started Manual

Table of Contents

Advertisement

Installing the System in a Distribution Rack

You can mount the Switch 9300 system into a
48.26 mm (19-in.) distribution rack. This section
describes how to prepare the system and distribution
rack for installation and how to mount the system in
the rack.
Install your distribution rack near an easily accessible
power outlet. You can power down the system only
by removing the power cord from the power source.

Preparing the System and Rack

To prepare the system and distribution rack for
installing the Switch 9300 system:
See Appendix B for distribution rack requirements.
1
Attach the mounting brackets to the left and right
2
sides of the system using the M4 x 10 mounting
bracket screws. See Figure 6.
Installing the System in a Distribution Rack
Figure 6 Installing System Mounting Brackets
Mounting screws
Distribution rack
mounting bracket
Locate the top of a universal mounting hole pattern
3
on either mounting rail of the distribution rack.
In this pattern, the spacing between holes is
/
inch,
/
inch, and
/
5
5
1
8
8
2
21
1000 Base - LX
TX
1
RX
TX
2
RX
TX
4
RX
TX
5
RX
Switch 9300
1
/
inch,
2
inch.

Advertisement

Table of Contents
loading

Table of Contents