Installing Shunt/Terminal Strip - Enterasys X-Pedition XSR-1805 Getting Started Manual

Security router
Hide thumbs Also See for X-Pedition XSR-1805:
Table of Contents

Advertisement

Cable, CompactFlash and Accessory Specifications

Installing Shunt/Terminal Strip

To install the shunt or terminal strip, attach two dual-pin units vertically to each four-pin jumper
(P2, P3, P4, or P5) corresponding to the RJ-48C port using a balun, as shown in
Figure
A-16. Any
other RJ-48C5 ports on the NIM card connected to 120-ohm lines do not require shunts.
Figure A-16
Installing a Grounding Shunt on the E1 NIM Card
XSR Getting Started Guide A-75

Advertisement

Table of Contents
loading

Table of Contents