Installation Of The Indoor Unit - Daikin FHQ35CAVEB Installation Manual

Split system ceiling suspended type
Hide thumbs Also See for FHQ35CAVEB:
Table of Contents

Advertisement

CAUTION
Do not remove the tape (milky white) applied to the outside of the indoor unit. It may cause electric shocks
or a fire.
(4) Install the hanging bolts.
• Use M8 or M10 bolts for hanging the indoor unit.
• Adjust the length of the hanging bolt from the ceiling in advance. (Refer to Fig. 9)
• Use hole-in-anchors for the existing bolts and embedded inserts or foundation bolts for new bolts, and
fix the unit firmly to the building so that it may withstand the mass of the unit.
In addition, adjust the distance from the ceiling in advance.
CAUTION
If the hanging bolt is too long, it may damage or break the indoor unit or options.
NOTE
• Parts shown Fig. 9 will be all field supply.

5. INSTALLATION OF THE INDOOR UNIT

〈〈It is easy to attach the optional parts before installing the indoor unit. Refer to also the installation
manual attached to the optional parts.〉〉
For installation, use the attached installation parts and specified parts.
(1) Fix the hanger to the hanging bolt. (Refer to Fig. 10)
CAUTION
For safety, make sure to use a washer for hanger (3) (accessory) and fix by double nuts firmly.
Hanging bolt
(2) Lift up the indoor unit, slide from the front and put the hanger installing bolt (M8) into the securely for tem-
porary hanging. (Refer to Fig. 11)
(3) Tighten the hanger fixing screws (M5) at 2 places, which were removed, as they were before.
(Refer to Fig. 11)
It is necessary to prevent misalignment of the indoor unit.
English
Foundation bolt
Hanging bolt
Ceiling surface
Fig. 9
Nut (field supply)
Washer for hanger (3) (accessory)
Double nuts
Hanger
Fig. 10
Ceiling slab
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents