Test Operation - Daikin FHQ35CAVEB Installation Manual

Split system ceiling suspended type
Hide thumbs Also See for FHQ35CAVEB:
Table of Contents

Advertisement

Earth leakage
( 3 ) ( 7 )
breaker
Outdoor unit
NOTE)
1 2 3
Indoor unit (Master)
NOTE
• Terminal numbers of outdoor and indoor units must be matched.

12. TEST OPERATION

〈Complete all the "1. Items to be checked after the installation work is completed" on page 4. Please
also refer to the installation manual attached to with outdoor unit.〉
(1) The settings of the wired remote controller should be switched while referring to the manual attached to
the remote controller.
(2) The settings of the other remote controller should be switched in accordance with the following procedure.
• Make sure that the installation work for the indoor and outdoor units is all completed.
• Make sure that the following items are all closed: the control box lid of the indoor unit and the outer board
and piping cover of the outdoor unit.
• After completing the refrigerant piping, drain piping, and electrical wiring, clean the interior of the indoor
unit and front panel. Next, perform test operation in accordance with the installation manual attached to
with the outdoor unit in order to protect the unit. (It is recommended that the test operation is performed
in the presence of qualified electrical technician or engineer.)
• In test operation, make sure that airflow direction and fan speed can be obtained according to the set-
tings.
• If interior work is still unfinished when test operation finishes, explain to the customer that the air cond-
tioner must not be operated until interior work is completed in order to protect the indoor units.
(If the indoor unit is operated under this condition, paint, glue, and other materials used during the inte-
rior finishing work will contaminate the indoor unit. This may cause water splashes or leakage.)
• If a malfunction occurs and the air conditioner cannot operate, refer to "12-1 HOW TO DIAGNOSE FOR
PROBLEMS".
• After completing the test operation, press the INSPECTION/TEST OPERATION button once to put the
indoor unit in inspection mode, and make sure the malfunction code is "00" (= normal).
If the code reads anything other than "00", refer to "12-1 HOW TO DIAGNOSE FOR PROBLEMS".
• Press the INSPECTION/TEST OPERATION button four times to return to normal operation mode.
English
Power supply
220 - 240V
~
50Hz
1 2 3
P1 P2
Indoor unit (Slave)
Remote controller
P1 P2
( 1 ) ( 2 )
Earth leakage
breaker
Outdoor unit
1 2 3
NOTE)
1 2 3
1 2 3
P1 P2
Indoor unit (Master)
( 4 )
( 9 )
Fig. 39
Power supply
220 - 240V
~
50Hz
1 2 3
P1 P2
Indoor unit
(Slave)
Remote controller
( 5 ) ( 6 )
P1 P2
P1 P2
28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents