Heat pump split single service 3 phase
2 9 5 Electrical connections
on the outdoor unit side
Access to the connection terminals.
- Remove the front panel. Remove the screws and the
front panel.
Figure 31 - Access to outdoor unit's terminal block
- Make the connections in accordance with the
diagram(s)
(figure 37, page
Terminal
block
Interconnection between
the outdoor unit and the
hydraulic unit
Figure 34 - Connections to outdoor unit's terminal block
- 24 -
Remove the screws
and push downwards
Terminal
block
Front panel
26).
General electrical
supply
- Use cable clamps to prevent the conductors from
being disconnected accidentally.
- Fill in the space where the cables enter the outdoor
unit with the insulating plate.
Cables
(supply and
interconnection)
Figure 32 - Finalisation of connection
to outdoor unit
Lateral side
Front
Figure 33 - Location of electrical cables and
refrigeration connections to outdoor unit
Installation and operating manual "1364 - EN"
Cable
clamps
Back
Underneath