Start-Up Data Sheet - Fujitsu 112 Installation And Operating Manual

Heat pump air/water split single service 3 phase
Hide thumbs Also See for 112:
Table of Contents

Advertisement

Heat pump split single service 3 phase
7 4

Start-up data sheet

Site
serial No.
Outdoor unit
model
Refrigerant type
Checks
Compliance with positioning distances
Condensate evacuation correct
Electric connections / connections tightnees
No GAS leaks (unit ID No . : )
Installation of refrigeration connection correct (lenght : m)
Reading in HEATING operating mode
Compressor discharge temperature
Liquid line temperature
Condensation temperature
HP = bar
Tank water output temperature
Tank water input temperature
Evaporation temperature
LP = bar
Suction temperature
Battery air input temperature
Battery air output temperature
Hydraulic system of hydraulic unit
Low temp . heating floor
Secondary system
LT Radiators
fan coils
Domestic hot water ; tank type
Estimated water volume of secondary system
Options & accessories :
Power supply for connected electric auxiliary
Operation in cooling mode possible
Location of room sensor correct
Cooling kit
DHW kit
2 zone kit
Control settings
Configuration type
Essential settings
- 58 -
Installer
Hydraulic unit
Refrigerant charge
Operating voltage & current on outdoor unit
L1/N
L2/N
L3/N
L1/E
L2/E
L3/E
°C
N/E
°C
Icomp
}
°C
sub-cooling
}
°C
ΔT condensation
}
°C
ΔT secondary
°C
}
°C
Overheating
}
°C
ΔT evaporation
}
°C
ΔT battery
Circulator brand
}
Circulator brand
Circulator brand
L
Boiler kit
Details
serial No.
model
V
V
V
V
V
V
V
A
Type
Type
Type
Room thermostat C55
Room control unit C75
Installation and operating manual "1364 - EN"
kg
°C
°C
°C
°C
°C
°C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

140160

Table of Contents