Carrier ROOM AIR CONDITIONER Installation Manual page 24

Inverter one-two/one-three/one-four/one-five split-type
Hide thumbs Also See for ROOM AIR CONDITIONER:
Table of Contents

Advertisement

1. Fix the hook with tapping screw onto the
wall. (Refer to Fig.49-7)
2. Hang the indoor unit on the hook.
Fig.49-7
4.4 Ceiling Installation
Fig.49-8
1. Remove the side board and the grille.
(Refer to Fig.49-9) (For 48000Btu/h and
60000Btu/h models, do not remove the
grille.)
Fig.49-9
Hook
Tapping screw
Washer
<6mm
Hanging arm
Side board
Grille
INSTALLATION INSTRUCTIONS
2. Location the hanging arm on the hanging
screw bolt. (Refer to Fig.49-10)
Prepare the mounting bolts on the unit.
(Refer to Fig.49-11)
Screw nut
Washer
Hanging
screw bolt
Hanging arm
Fig.49-10
3. Hang the unit on the hanging arm by
sliding backward. Securely tighten the
mounting bolts on both sides.
(Refer to Fig.49-12)
CAUTION
The figures aboe are based on model with
18000Btu/h as rated capacity, which may
differ from the unit you purchased.
23
Mounting bolt
(Max.40mm)
Fig.49-11
Hanging
Screw bolt
Hanging arm
Mounting bolt
D. Connecting point of
refrigerant pipe(D.gas side)
E. Connecting point of
refrigerant pipe
(E. Liquid side)
Drain point
Fig.49-12
35mm
≥1000mm
Fig.49-13
8-13mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents