Unpacking - Avaya IP Ofice IP50 V2 Quick Installation Manual

Table of Contents

Advertisement

2.1 Unpacking

· c Check for Package Damage.
Before unpacking any equipment, check for any signs of damage that may have occurred during transit. If any
damage exists bring it to the attention of the carrier.
· c Check the Correct Parts Have Been Delivered.
Check all cartons against the packing slip and ensure that you have the correct items. Report any errors or
omissions to the equipment supplier.
· c Retain All Packaging and Documentation.
While unpacking the equipment, retain all the packaging material. Fault returns are accepted only if repackaged in
the original packaging. If performing a staged installation, the original packaging will also assist when repacking
equipment to be moved to the final install site.
· c Ensure that Anti-Static Protection Measures are Observed.
Ensure that anti-static protection measures are observed at all times when handling equipment with exposed
electrical circuit boards.
· c Check All Parts.
Visually inspect each item and check that all the necessary documentation and accessory items have been included.
Report any errors or omissions to the dealer that supplied the equipment.
· c Check All Documentation.
Ensure that you read and retain any documentation included with the equipment.
PARTNER Version Quick Installation Guide
IP Office Essential Edition
Objective - To check that the correct equipment has been supplied and
that no damage has occurred during transit.
Information Required
· Equipment Checklist.
Obtain an installation checklist of the parts and equipment expected.
· Identify the Avaya SD Memory Card
The serial number is printed on the SD, prefixed with FK.
Installation:
Page 17
- Issue 1b (09 April 2010)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip office essential edition partner version

Table of Contents