Baxi Potterton Combi 24 HE Installation & Service Instructions Manual page 29

Wall mounted powered flue condensing combination boiler gas fired central heating unit
Hide thumbs Also See for Combi 24 HE:
Table of Contents

Advertisement

Baffle
Fig. 44
Fig. 45
,...............................................
Fig. 46
,
\
~
Threaded
\
~
Bu~h
\
Fig. 47
J-
L/~
Electrode
Leads
Gas Supply Pipe
Blanking
Cap
Cold Water
InletTap
Cartridge
Body
Filter Gauze
~
~..'
Fig. 55
~.
Flow.."'"
Regulator.
Fig. 48
Inlet / Return Manifold
Venturi
11.0
SERVICING THE BOILE'R
11.1
Annual Servicing (Cont)
10. Ease the front edge of the left hand baffle
upwards, disengaging the spring clip. Disengage the
tab on the baffle from the slot in the fan hood (Fig.44).
11. Undo the screws securing the fan hood assembly
to the appliance back panel, and draw the fan and
hood assembly forwards (Fig. 45).
12. Draw the burner out of the combustion box, pulling
the electrode grommets from the slots in the
combustion box lower panel (Fig. 46).
13. Disconnect the electrode leads and grommets
from the electrodes. Completely remove the burner
(Fig. 46).
14. Brush any deposits from the injectors. Do not use
a pin or wire to clean them.
15. Brush the burner blades and venturis and clean
the combustion box.
16. Ensure that the heat exchanger fins are clear of
any obstruction.
NOTE: If necessary the secondary heat exchanger
may be dismantled
-
see section
12.23
D.H.W. Filters (Fig.
48)
17. If the flow of domestic hot water is diminished, it
may be necessary to clean the filters.
18. Initially check the cold water inlet tap filter.
19. Turn the tap off. Undo the blanking cap and
remove the threaded bush (Fig. 47).
20. Extract the filter and rinse thoroughly in clean
water. Reassemble and check the flow. If required
clean the manifold filter as described below.
21. Undo the filter cartridge from the inlet/return
manifold.
22. Dismantle the cartridge and carefully remove the
flow regulator and filter gauze. Rinse them thoroughly
in clean water and reassemble in reverse order.
23. Check that the pressure vessel charge is 0.5bar,
reassemble in reverse order of dismantling.
24. Turn the selector switch fully anticlockwise against
the spring pressure to position R and hold for 2
seconds to reset the boiler before recommissioning.
25. Complete the relevant Service Interval Record
section of the Benchmark Commissioning Checklist at
the rear of this publication and then hand it back to the
user.
28

Advertisement

Table of Contents
loading

This manual is also suitable for:

Main combi 24 he

Table of Contents