Prepare Boiler — Draft Hood & Spill Switch; Draft Hood Installation; Spill Switch Installation; Prepare Boiler — Install Vent Piping - Weil-McLain Gold CGa Installation And Maintenance Instructions Manual

Gas-fired water boilers
Hide thumbs Also See for Gold CGa:
Table of Contents

Advertisement

GOLD CGa Gas-Fired Water Boiler — Boiler Manual
2c
Prepare boiler — draft hood & spill switch
Draft hood installation
1. Orient draft hood with spill switch mounting holes to front of boiler
as shown in Figure .
. Secure draft hood to outlet at top of boiler with sheet metal screws.
3. Bottom of draft hood or "skirt" must have clearance dimension above
jacket top panel as indicated on draft hood.
Do not alter boiler draft hood or place any obstruction or
non-approved vent damper in breeching or vent system.
CSA certification will become void. Flue gas spillage and
carbon monoxide emissions will occur causing severe
personal injury or death.
Figure 6 Install spill switch
2d
Prepare boiler — install vent piping
Long horizontal vent connector,
excessive number of elbow or
tees, or other obstructions that
restrict the flow of combustion
gases should be avoided. Severe
personal injury, death or sub-
stantial property damage could
result.
14
Spill switch installation
1. Fasten spill switch to draft hood as shown in
and
Figure 7
. See Wiring diagram to connect wires:
a. Standing pilot boiler — see
b. Spark-ignited pilot boiler —
see
Figure 7 Spill switch with wire harness
1. Connect from draft hood or vent damper outlet to chimney or vent
with same size vent connector.
. Where possible, vertical venting to the outside from the draft hood or
vent damper outlet will offer best performance.
3. Where horizontal vent connector is used, slope upward at least ¼" per
lineal foot toward chimney or vent and support with hangers to prevent
sagging.
4. Breeching
must not
be connected to any portion of a mechanical draft
system that can operate under positive pressure.
.
page 34
pages 38
and
39
.
Improper orientation of spill switch
may cause boiler to shut down. The
loss of heat can result in significant
damage due to freezing.
Part Number 550-101-009/0107
Figure 6
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents