12.9 ICC Control Operation with Conventional Thermostat Wiring

I I n n s s t t a a l l l l a a t t i i o o n n V V e e r r i i f f i i c c a a t t i i o o n n
• 24V AC power on R&C must be present at the ICC for it to operate
• Line voltage must be present at the ICC for the compressor and the outdoor fan
to operate
• The ICC displays a "0" for standby mode. Standby mode indicates line voltage
and 24VAC are present at the ICC and there is not a call for unit operation from
the thermostat.
Zero (0) displayed
The unit is in standby
Zero (0) displayed
Call for Compressor Operation (Y1 LED)
The unit is in standby
Call for Compressor Operation (Y1 LED)
If a call for compressor operation is received by the ICC (first stage/second stage coolin
If a call for compressor operation is received by the ICC (first stage/second stage cooling or
Call for Compressor Operation (Y1 LED)
first stage/second stage heating), the red Y1 LED will illuminate.
first stage/second stage heating), the red Y1 LED will illuminate.
If a call for compressor operation is received by the ICC (first stage/second stage cooling or
C C a a l l l l f f o o r r C C o o m m p p r r e e s s s s o o r r O O p p e e r r a a t t i i o o n n ( ( Y Y 1 1 L L E E D D ) )
The ICC has an on/off fan delay of one (1) second for each stage of heating or cooling.
The ICC has an on/off fan delay of one (1) second for each stage of heating or cooling.
The ICC ignores the lower pressure control for the first 90 seconds of compressor opera
first stage/second stage heating), the red Y1 LED will illuminate.
• If a call for compressor operation is received by the ICC (first stage/second stage
cooling or first stage/second stage heating), the red Y1 LED will illuminate.
The ICC ignores the lower pressure control for the first 90 seconds of compressor operation.
The ICC has an on/off fan delay of one (1) second for each stage of heating or cooling.
On heat pumps, the ICC ignores the LPC during the defrost cycle.
On heat pumps, the ICC ignores the LPC during the defrost cycle.
The ICC ignores the lower pressure control for the first 90 seconds of compressor operation.
The 7-segment LED can display five (5) codes during a call for unit operation:
• The ICC has an on/off fan delay of one (1) second for each stage of heating or
cooling.
The 7-segment LED can display five (5) codes during a call for unit operation:
On heat pumps, the ICC ignores the LPC during the defrost cycle.
• The ICC ignores the lower pressure control for the first 90 seconds of compressor
1) First Stage Cooling Operation – When the ICC receives a call for first stage cooli
The 7-segment LED can display five (5) codes during a call for unit operation:
operation.
1) First Stage Cooling Operation – When the ICC receives a call for first stage cooling
operation, a lower case "c" is displayed on the 7-segment LEDs.
operation, a lower case "c" is displayed on the 7-segment LEDs.
• On heat pumps, the ICC ignores the LPC during the defrost cycle.
1) First Stage Cooling Operation – When the ICC receives a call for first stage cooling
operation, a lower case "c" is displayed on the 7-segment LEDs.
• The dual 7-segment LED displays five (5) operational status codes:
1 1 ) ) F F i i r r s s t t S S t t a a g g e e C C o o o o l l i i n n g g O O p p e e r r a a t t i i o o n n – When the ICC receives a call for first stage
cooling operation, a lower case "c" is displayed on the dual 7-segment LEDs.
Lower case "c" indicates first stage cooling operation
2) Second Stage Cooling Operation – When the ICC receives a call for second stage
Lower case "c" indicates first stage cooling operation
2 2 ) ) S S e e c c o o n n d d S S t t a a g g e e C C o o o o l l i i n n g g O O p p e e r r a a t t i i o o n n – When the ICC receives a call for second
2) Second Stage Cooling Operation – When the ICC receives a call for second stage
stage cooling operation, an upper case "C" is displayed on the dual 7-segment
cooling operation, an upper case "C" is displayed on the 7-segment LEDs.
LEDs.
cooling operation, an upper case "C" is displayed on the 7-segment LEDs.
2) Second Stage Cooling Operation – When the ICC receives a call for second stage
cooling operation, an upper case "C" is displayed on the 7-segment LEDs.
Upper case "C" indicates second stage cooling operation
3 3 ) ) F F i i r r s s t t S S t t a a g g e e H H e e a a t t i i n n g g O O p p e e r r a a t t i i o o n n - When the ICC receives a call for first stage
3) First Stage Heating Operation - When the ICC receives a call for first stage heatin
Upper case "C" indicates second stage cooling operation
heating operation, "h" is displayed on the dual 7-segment LEDs.
3) First Stage Heating Operation - When the ICC receives a call for first stage heating
operation, "h1" is displayed on the 7-segment LEDs.
operation, "h1" is displayed on the 7-segment LEDs.
3) First Stage Heating Operation - When the ICC receives a call for first stage heating
operation, "h1" is displayed on the 7-segment LEDs.
4) Second Stage Heating Operation - When the ICC receives a call for second stage
4) Second Stage Heating Operation - When the ICC receives a call for second stage
heating operation, "h2" is displayed on the 7-segment LEDs.
heating operation, "h2" is displayed on the 7-segment LEDs.
4) Second Stage Heating Operation - When the ICC receives a call for second stage
heating operation, "h2" is displayed on the 7-segment LEDs.
INSERT FIGURES 7 THRU 10 HERE FR
13.X ICC Control Operation with Conventional Therm
Installation Verification
24V AC power on R&C must be present at the ICC for it to ope
Line voltage must be present at the ICC for the compressor and
The ICC displays a "0" for standby mode. Standby mode indica
are present at the ICC and there is not a call for unit operation fr
Zero (0) displayed
The unit is in standby
Zero (0) displayed
The unit is in standby
Lower case "c" indicates first stage cooling operation
Lower case "c" indicates first stage cooling operation
Upper case "C" indicates second stage cooling operation
Upper case "C" indicates second stage cooling operation
"h" indicates first stage heating operation
"h1" indicates first stage heating operation
"h1" indicates first stage heating operation
"h1" indicates first stage heating operation