Boiler Connections
Wall Mounting
(continued)
Mounting the boiler
3.
Fig. 9
16
4.
2.
2x
1.
1. To open hinged cover, lift cover A
and pivot control unit flap B down.
All boiler controls are located behind
the control unit flap.
2. Loosen the screws at the bottom of
the boiler; do not remove
completely.
3. Remove front enclosure panel (lift up
and pull towards you).
For installation of the
mounting bracket, see
"Wall mounting bracket
installation" on page 14
of this manual.
4. Mount boiler onto the mounting
bracket and connect boiler to the
installation fittings.