Base Installation - Thermo Pride CMA1-50N Installation And Service Manual

Gas fired high efficiency furnace, down flow & direct vent (sealed combustion)
Table of Contents

Advertisement

All installations and services must be performed by qualified service personnel.
B. BASE INSTALLATION
1. Combustible Floor Base Model: 70 BASE
Use the base bottom panel as a template to mark floor opening locations (see
Figure 2). Cut a square opening in the floor for the supply air connector duct. Cut
the opening 1-inch larger than the square template opening. (duct requires 1-inch
clearance to combustible floor).
After cutting openings in the floor, place the bottom panel in position. Mark the
square opening location on the distribution duct at the connection point of the
Figure 2.
Figure 3.
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cma2-75n

Table of Contents