Sylvania 6842PF M Service Manual page 126

Hide thumbs Also See for 6842PF M:
Table of Contents

Advertisement

CBA EXCHANGE
Caution
1. To remove CBA, wait 1 minute after power was off for discharge from electrolysis capacitors.
Quick adjustment after CBA exchange.
CBA
Name
SC CBA Unit
Vad
SS CBA Unit
Ve
D CBA Unit
-
SU CBA Unit
-
SD CBA Unit
-
C1 CBA Unit
-
C2 CBA Unit
-
Adjustment Volume Location
SU
SD
Test Point Location
SU
TPVSET
SD
TPVSCN
TPVAD
Test Point
Voltage
TPVAD (SC)
-90V ± 1V
TPVE (SS)
Ve ± 1V
-
-
-
-
-
SC
D
C1
VR6600(Vad)
TPV15V
SC
D
C1
Volume
VR6600 (SC)
VR6000 (SS)
-
-
-
-
-
-
-
-
-
-
SS
C2
SS
C2
2-4-2
Remarks
See the Panel label
Adjustment is not required
Adjustment is not required
Adjustment is not required
Adjustment is not required
Adjustment is not required
VR6000(Ve)
TPVDA
TPVe
L0655PADJ

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents