CBA EXCHANGE
Caution
1. To remove CBA, wait 1 minute after power was off for discharge from electrolysis capacitors.
Quick adjustment after CBA exchange.
CBA
Name
SC CBA Unit
Vad
SS CBA Unit
Ve
D CBA Unit
-
SU CBA Unit
-
SD CBA Unit
-
C1 CBA Unit
-
C2 CBA Unit
-
Adjustment Volume Location
SU
SD
Test Point Location
SU
TPVSET
SD
TPVSCN
TPVAD
Test Point
Voltage
TPVAD (SC)
-90V ± 1V
TPVE (SS)
Ve ± 1V
-
-
-
-
-
SC
D
C1
VR6600(Vad)
TPV15V
SC
D
C1
Volume
VR6600 (SC)
VR6000 (SS)
-
-
-
-
-
-
-
-
-
-
SS
C2
SS
C2
2-4-2
Remarks
See the Panel label
Adjustment is not required
Adjustment is not required
Adjustment is not required
Adjustment is not required
Adjustment is not required
VR6000(Ve)
TPVDA
TPVe
L0655PADJ