Check Electrical Connections; Check Gas Pipes And Fittings For Leaks - Viessmann VITODENS 222-F Service Instructions Manual

Floor mounted, gas-fired condensing storage combi boiler
Table of Contents

Advertisement

Service

Check Electrical Connections

Check Gas Pipes and Fittings for Leaks

26
Vitodens 222-F B2TA 19 and 35 Service
Ensure all plug-in connectors and strain reliefs make
positive contact and are seated properly.
Refer to the Installation Instructions
Note: For the tightness test, use only suitable and
approved leak detecting agents and devices.
Leak detecting agents with unsuitable contents
(e.g. nitrites, sulphides) can lead to material
damage. Remove residues of the leak detecting
agent after testing.
WARNING
Escaping gas leads to a risk of explosion.
Check gas equipment for tightness.
WARNING
The gas supply piping must be leak tested before placing
the boiler in operation.
CAUTION
Ensure all joints of gas line are pressure tight and that
gas valves do not leak when under normal operating
pressure (use approved leak detection liquid).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents