Completion - Potterton Performa System 12 HE Installation & Service Instructions Manual

Wall mounted powered flue condensing boiler gas fired central heating unit
Hide thumbs Also See for Performa System 12 HE:
Table of Contents

Advertisement

10.0 COMPLETION

10.1
Completion
Case Front Panel
1. Hinge the facia panel upwards and refit the case
front panel. Tighten the securing screws (Fig. 34).
2. Instruct the user in the operation of the boiler and
system, explaining the operational sequence.
3. Carefully read and complete all sections of the
Benchmark Commissioning Checklist at the rear of
this publication that are relevant to the appliance and
installation. These details will be required in the event
of any warranty work. The publication must be
handed to the user for safe keeping and each
subsequent regular service visit recorded.
4. For IE, it is necessary to complete a "Declaration of
Conformity" to indicate compliance with I.S. 813. An
example of this is given in I.S. 813 "Domestic Gas
Installations". This is in addition to the Benchmark
Commissioning Checklist.
5. Hand over the Users Operating, Installation and
Servicing Instructions, giving advice on the necessity
of regular servicing.
Fig. 34
Facia Panel
29
Publication No. 5111817

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Performa system 24 hePerforma system 28 he

Table of Contents