Agc; Apc; Adc; Setting - LG B2000 Service Manual

Lg phone
Hide thumbs Also See for B2000:
Table of Contents

Advertisement

11.4 AGC

This procedure is for Rx calibration.In this procedure, We can get RSSI correction value. Set
band EGSM and press Start button theresult window will show correction values per every
power level and gain code and the samemeasure is performed per every frequency.

11.5 APC

This procedure is for Txcalibration.In this procedure you can get proper scale factor value and
measured power level.

11.6 ADC

This procedure is for battery calibration.You can get main Battery ConfigTable and temperature
ConfigTable

11.7 Setting

check com port and cable loss. Select automatic calibration item. If you uncheck one itemcalibra-
tion will stop from the unchecked item. This is useful when you want to process only oneitem.

11.8 How to do calibration

A. Connect cable between phone and serial port of PC.
B. Connect Ag8960 equipment and Power Supply and phone.
C. Set correct port and baud rate.
D. Press Start button. AutoCalprocess all calibration procedure
i. AGC EGSM
ii. AGC DCS
iii. APC EGSM
iv. APC DCS
v. ADC
E. After finished all measurement. The state is return to SETUP.
F. The Cal file will be generated and then the calibration data will be written into phone and
thenwill be reset.
- 117 -
11. AUTO CALIBRATION

Advertisement

Table of Contents
loading

Table of Contents