Weider 8530 WESY85301 User Manual page 5

Table of Contents

Advertisement

2. Insert two 5/16Ó x 2 1/2Ó Carriage Bolts (1) up
through the Base (4).
Slide the Front Upright (42) onto the 5/16Ó x
2 1/2Ó Carriage Bolts (1) in the Base (4).
Hand-tighten a 5/16Ó Nylon Locknut (3) onto
each Carriage Bolt. Do not tighten the
Nylon Locknuts yet.
Press a 1Ó Inner Cap (6) into the Front
Upright (42). Press a 2Ó Inner Cap (27) into
the Squat Upright (56). Press a 2Ó Inner Cap
into the VKR Upright (74).
3. Press a 2Ó Inner Cap (27) into the end of the
Top Frame (55). Press a 1 3/4Ó Inner Cap
(44) into each end of the crossbar on the Top
Frame. Press two Inner Caps (96) into the top
of the crossbar.
Attach the Top Frame (55) to the Front
Upright (42) with two 5/16Ó x 2 3/4Ó Bolts (11),
two 5/16Ó Flat Washers (8), and two 5/16Ó
Nylon Locknuts (3).
Attach the Top Frame (55) to the VKR Upright
(74) and the Squat Upright (56) with two 5/16Ó
x 2 3/4Ó Bolts (11) and two 5/16Ó Nylon
Locknuts (3).
Tighten all of the Nylon Locknuts used in
steps 1Ð3.
4. Set two Weight Bumpers (19) on the bracket
on the Base (4) as shown. Set two Weight
Bumpers (19) on the bracket on the Stabilizer
(5).
Stack eight Weights (25) onto each set of
Weight Bumpers (19). Be sure that the pin
grooves are all on the same side of each
stack of Weights.
Be careful not to tip either stack of
Weights (25) until step 6 is complete.
2
27
56
74
3
55
27
11
56
74
4
25
19
5ÑBracket
4ÑBracket
5
27
42
3
4
1
11
3
96
8
Crossbar
44
3
42
Pin
Grooves
25
Grooves
19
6
44
Pin

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8530Wesy85301

Table of Contents