Toshiba Satellite U300 Series Maintenance Manual page 113

Hide thumbs Also See for Satellite U300 Series:
Table of Contents

Advertisement

Subtest 03
CPU Temperature
This will display CPU Temperature for check , press [ESC] to exit .
[CPU_TEMP.EXE] Program Version : 1.0 03-27-2007
CPU Temperature : XX
Subtest 04
3D HDD Protection Test (90d)
1. For Field inspection T&D.
This program judges by sampling five kinds of data shown below.
No Item
1
Access
platform.
2
Test Fixture
3
Test1
12
Contents
An access platform is leveling.
The Fixture which fixes PC by 90 degree inclination is used.
Vibration/shock doesn't take a PCB at the time of T&D inspection.
The display of a test program and the set method of PC are shown
below.
Display of a Test Program
The portion which PC and Test-Fixture contact is green.
Set method of PC
Z
Upper
Satellite U300 and Satellite Pro U300 Tests and Diagnostics Manual
Test Program for Field.
X

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite pro u300 series

Table of Contents