Toshiba RAS-10UKV-E Service Manual page 69

Split wall type air-conditioner
Table of Contents

Advertisement

No.
Part name
3
Inverter
assembly
Procedures
1) Perform work of item 1 of 1.
2) Remove screw (ST1T∅4 x 10s 1 pc.) of
the upper part of the front cabinet.
• If removing the inverter cover in this
condition, the P.C. board can be checked.
• If there is no space in the upper part of
the upper cabinet, perform work of 2.
Be careful when checking the
inverter because high-voltage
circuit is incorporated in it.
3) Perform discharging by connecting the
e,d polarities by discharging resistance
(approx. 100Ω40W) or plug of soldering
iron to e,d terminals of the C13 (printed
"CAUTION HIGH VOLTAGE" is attached.)
electrolytic capacitor (500 µF/330 WV) on
the P.C. board.
Be careful to discharge the capacitor
because the electrolytic capacitor
cannot naturally discharge and
voltage remains depending on the
malfunction state in some cases.
NOTE :
This capacitor has mass capacity.
Therefore, it is dangerous that a
large spark generates if short-
circuiting between the e,d polarities
with screwdriver, etc. for discharging.
4) Perform the work of 2.
5) Remove the screw (ST1T∅4 x 10s 1 pc.)
fixing the main body and the inverter box.
6) Remove the lead wire from the holder on
the terminal block.
7) Disconnect the connectors of various lead
wires.
Requirement :
As each connector has a lock
mechanism, avoid removing the
connector by holding the lead wire,
but by holding the connector.
Discharging time
(Discharging period
10 seconds or more)
The connector is one with lock,
so remove it while pushing the
part indicated by an arrow.
Be sure to remove the connector
by holding the connector, not by
pulling the lead wire.
– 68 –
FILE NO. SVM-02007
Remarks
Inverter cover
PC board
(Soldered surface)
Plug of
soldering iron
Holder
Terminal
block
Partition

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ras-10uav-eRas-10ukv-e3Ras-10uav-e3

Table of Contents