Blower Accessory 2302 And 2303 - Williams 1403622 Owner's Manual

Direct-vent wall furnace
Hide thumbs Also See for 1403622:
Table of Contents

Advertisement

Blower Accessory 2302 and 2303

This accessory can be operated using the factory equipped three-prong (grounding) plug and cord or may be field wired. See field
wiring installation instructions below. When using the plug and cord, for your protection against shock hazard, it must be plugged
directly into a properly grounded three- prong receptacle. DO NOT REMOVE THE PRONG. All electrical work must conform to your
local codes and ordinances, or in their absence, with National Electrical Code ANSI/NFPA 70. In Canada, Canadian Electrical Code
C22.1. It must also be electrically grounded. If you are not familiar with wiring codes in general, have a competent electrician do the job.
WARNING: Danger of property damage bodily injury or death. Unplug the service cord from the electrical
outlet before removing or working on this blower kit.
Mounting
Model 2302
1. Remove the knock-out plates "A" and "B" from right side of
the furnace. (Figure 1 page 20).
2. Remove the junction box cover and place the blower and
junction box in position as shown on Figure 1 page 20.
3. Attach the blower and the junction box to the inner casing
using the pre-punched holes with screws "C" and "D"
provided with this kit. See Figure 1 on page 20 for proper
mounting hole to use with your furnace model (see rating
plate for furnace model number). Reattach the junction box
cover.
4. After the blower and junction box are installed, rotate
bushing "H" if needed to prevent the motor wire from
binding against the blower casing.
5. Plug in the factory supplied three-prong (grounding) plug
and cord or see field wiring instructions below.
Model 2303
1. Set the blower on top of the furnace with the rear flange of
the blower cabinet behind the furnace cabinet. This will
place the back of the blower cabinet against the wall
surface. (See Figure 2 page 20).
2. Plug in the service cord.
Field Wiring
Model 2302
1. Remove the junction box cover and disconnect the factory
installed three-prong (grounding) plug and cord.
2. Install a 115V line in accordance with local codes,
connecting as shown in the wiring diagram. (Figure 1 page
20).
3. Reattach the junction box cover.
Important: Oil yearly with SAE 20 high temp oil.
Blower Operation
Model 2302
The automatic fan switch turns on the blower after the furnace
has been operating a few minutes and turns off the blower after
the furnace shuts off. The blower will not operate unless the
fan switch (pull chain) is pulled to the "ON" position, either
"HIGH" or "LOW". To check the fan switch (pull chain) position,
tum the automatic fan switch dial to 70, then pull the chain on
the fan switch to obtain the high, low or off position. Set the
automatic fan switch dial to 110 and readjust it higher or lower
as necessary to obtain blower operation within 4 to 5 minutes
after the furnace burner is in operation.
Model 2303
You must select "ON" for continuous blower operation or
"AUTO" for automatic blower operation. If blower is set on
"AUTO" when the furnace heats up, the heat sensor switch is
activated and the blower will turn off. The blower will not
operate if the fan switch is set in the "OFF' (center) position.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents