GE JCAS745 Owner's Manual And Installation Instructions page 35

Electric coil & radiant ranges
Table of Contents

Advertisement

5
FINAL INSTALLATION
CHECKLIST
Check to make sure the circuit breaker is
l
closed (RESET) or the circuit are replaced.
Be sure power is in service to the building.
l
Note (on some models): If the clock
l
flashes "bad" and then "LinE" with a loud
tone, the neutral connection to the range
is miswired. Check the terminal block
connections and/or house wiring to correct.
Check to be sure that all packing materials
l
and tape have been removed. This will
include tape on metal panel under control
knobs (if applicable), adhesive tape, wire
ties, cardboard and protective plastic.
Failure to remove these materials could
result in damage to the appliance once the
appliance has been turned on and surfaces
have heated.
Check to make sure that the rear leveling
l
leg is fully inserted into the Anti-Tip bracket
and that the bracket is securely installed.
Installation Instructions
6
OPERATION CHECKLIST
Turn on one of the surface to observe that
l
the element glows within 60 seconds. Turn
the unit off when glow is detected. If the
glow is not detected within the time limit,
recheck the range wiring connections.
If change is required, retest again. If no
change is required, have building wiring
checked for proper connections and voltage.
Check to make sure the Clock (on models
l
so equipped) display is energized. If a series
of horizontal red lines appear in the display,
disconnect power immediately. Recheck the
range wiring connections. IF change is made
to connections, retest again. If no change
is required, have building wiring checked
for proper connections and voltage. It is
recommended that the clock be changed if
the red lines appear.
Be sure all range controls are in the OFF
l
position before leaving the range.
35
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jcap750Jcap765Jcas445Jcap760

Table of Contents