Verifying the installation
After you complete the installation, verify that:
There is enough space for heat dissipation around the switch, and the rack or workbench is stable.
•
•
The grounding cable is securely connected.
•
The correct power source is used.
The power cords are properly connected.
•
All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket
•
strip with lightning protection and lightning arresters for network ports have been properly
connected.
20