Carrier 58CTA Installation, Start-Up, Operating And Service And Maintenance Instructions page 20

2-stage deluxe, induced combustion 4-way multipoise gas furnace series 140/e
Table of Contents

Advertisement

BLK
BLK
WHT
WHT
GND
115-VOLT FIELD-
JUNCTION
SUPPLIED
BOX
FUSED
DISCONNECT
A 1/8- -in. (3 mm) NPT plugged tapping, accessible for test gauge
connection, MUST be installed immediately upstream of gas
supply connection to furnace and downstream of manual
equipment shutoff valve.
Piping should be pressure and leak tested in accordance with
NFGC in the United States, local, and national plumbing and gas
codes before the furnace has been connected. After all
connections have been made, purge lines and check for leakage at
furnace prior to operating furnace.
If pressure exceeds 0.5 psig (14- -In. W.C.), gas supply pipe must
be disconnected from furnace and capped before and during
supply pipe pressure test. If test pressure is equal to or less than
0.5 psig (14- -In. W.C.), turn off electric shutoff switch located on
furnace gas control valve and accessible manual equipment
shutoff valve before and during supply pipe pressure test. After
all connections have been made, purge lines and check for
leakage at furnace prior to operating furnace.
The gas supply pressure shall be within the maximum and
minimum inlet supply pressures marked on the rating plate with
the furnace burners ON and OFF.
ELECTRICAL CONNECTIONS
WARNING
!
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal
injury or death.
Blower access panel door switch opens 115- -v power to
control. No component operation can occur. Do not bypass
or close switch with panel removed.
See Fig. 23 for field wiring diagram showing typical field 115- -v
wiring. Check all factory and field electrical connections for
tightness.
Field- -supplied wiring shall conform with the limitations of 63_F
(33_C) rise.
NOTE 2
W
C
FIVE
WIRE
THREE-WIRE
HEATING-
ONLY
W2
COM
W/W1
NOTE 1
Y/Y2
R
CONTROL
BOX
G
24-VOLT
TERMINAL
NOTES: 1.
BLOCK
FURNACE
Fig. 23 - - Field Wiring Diagram
FIELD 24-VOLT WIRING
FIELD 115-, 208/230-, 460-VOLT WIRING
FACTORY 24-VOLT WIRING
FACTORY 115-VOLT WIRING
1-STAGE
THERMOSTAT
Y
R
G
TERMINALS
CONDENSING
UNIT
Connect Y/Y2-terminal as shown for proper operation.
2.
Some thermostats require a "C" terminal connection as shown.
3.
If any of the original wire, as supplied, must be replaced, use
same type or equivalent wire.
!
ELECTRICAL SHOCK AND FIRE HAZARD
Failure to follow this warning could result in personal
injury, death, or property damage.
The cabinet MUST have an uninterrupted or unbroken
ground according to NEC ANSI/NFPA 70- -2008 or local
codes to minimize personal injury if an electrical fault
should occur. This may consist of electrical wire, conduit
approved for electrical ground or a listed, grounded power
cord (where permitted by local code) when installed in
accordance with existing electrical codes. Refer to the
power cord manufacturer's ratings for proper wire gauge.
Do not use gas piping as an electrical ground.
!
FURNACE MAY NOT OPERATE HAZARD
Failure to follow this caution may result in intermittent
furnace operation.
Furnace control must be grounded for proper operation or
else control will lock out. Control must remain grounded
through green/yellow wire routed to gas valve and manifold
bracket screw.
115- -V WIRING
Verify that the voltage, frequency, and phase correspond to that
specified on unit rating plate. Also, check to be sure that service
provided by utility is sufficient to handle load imposed by this
equipment. Refer to rating plate or Table 7 for equipment
electrical specifications.
20
FIELD-SUPPLIED
FUSED DISCONNECT
208/230- OR
460-VOLT
THREE
PHASE
208/230-
VOLT
SINGLE
PHASE
GND
WARNING
CAUTION
A95236

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

58ctx

Table of Contents