Epson Stylus C58/C59/ME 2/C79/D78/C90/C91/C92/D92/T20/T20E/T23/T26/S20/T10/T11/ME 30/T21/T24/T27/S21
>> From the previous page.
3.
Fold back the Head FFC and secure it with Rib A again.
Figure 4-31. Installing Head FFC (3)
4.
Connect the Head FFC to CN1, CN3 of the Main Board.
(see
" 4.4.1 Main Board "
5.
Arrange FFC1 on top of FFC2.
6.
Secure the Head FFC with a Strong tape by the following
standard.
•
Size: 60mm (L) x 18mm (W)
•
The tape must be attached vertically to the Head FFC.
•
The lower end of the tape must be 1-2 mm below the upper
side of the hook hole as shown in the figure.
Strong Tape (60mm x 18mm)
Figure 4-32. Installing Head FFC (4)
DISASSEMBLY/ASSEMBLY
Head FFC
(p.40))
CN1,CN3
FFC2
FFC1
1-2mm
Hook hole
Disassembling Printer Mechanism
Epson Stylus C58/C59/ME 2's Case
1.
Put the Head FFC through the Hole of the Main Frame.
(see
)
Figure 4-29 (p.48)
2.
Secure the Head FFC with Rib A, and B.
(see
)
Figure 4-29 (p.48)
3.
Fold back the Head FFC and secure it with Rib A again.
(see
)
Figure 4-31 (p.49)
4.
Put the Head FFC through the Ferrite Core with double
sided tape behind.
5.
Connect the Head FFC to CN1, CN3 of the Main Board.
(see
" 4.4.1 Main Board "
(p.40))
6.
Secure the Ferrite Core to the Main Frame with double
sided tape by the following standard.
The top end of the Ferrite Core must be 1mm above the
•
horizontal marking on the Main Frame.
Main Frame
Marking
1mm
Ferrite Core
Figure 4-33. Installing Head FFC (5)
>>To be continued to the next page.
Revision E
Main Board
CN1,CN3
49
Confidential