Hardware installation
4.2
Installing/removing the server in/from the
rack
V
CAUTION!
Please note the safety instructions in
on page
on page
At least two people are needed to position the server into/out of the
rack.
The rack can tip over when more than one unit is removed.
The server may not occupy the top height unit of the rack (38 HU/42
HU PRIMECENTER Rack and/or DataCenter Rack), as otherwise
boards or fans cannot be replaced even with the plug-in module fully
extended.
4.2.1

Rack system requirements

The rack systems from Fujitsu Technology Solutions, PRIMECENTER Rack
and DataCenter Rack, support the installation of PRIMERGY servers.
Installation in most current rack systems from other manufacturers (3rd party
racks) is also supported.
To accommodate the ventilation concept and ensure proper ventilation, any
unused areas in the rack must be sealed using dummy covers.
The power is supplied via the multiple socket outlets fitted in the rack.
PRIMECENTER/DataCenter Rack
The main features of the rack systems from Fujitsu Technology Solutions are as
follows:
– Support systems that can be mounted without tools
The support systems have a linear alignment feature to ensure that they can
be adjusted to different rack depths.
– Enhanced cable management in the lateral rack area
The mounting of the rails in the different racks is described in the next sections.
RX300 S5

Installing/removing the server in/from the rack

27, in particular the
37.
Operating manual
chapter "Important information"
section "Notes on installing in the rack"
43