Warning - Shindaiwa EB8520RT Owner's/Operator's Manual

Hide thumbs Also See for EB8520RT:
Table of Contents

Advertisement

Available languages

Available languages

Assembly
Assembling the Blower (continued)
7.
Insert the static wire through the swivel
tube, then install and tighten the 89mm
clamp over the rotating band on the
swivel tube.
8.
Fold the end of the static wire back over
the connection of the swivel tube. See
Figure 5.
9.
Grasp the nozzle, and push the nozzle
over the swivel tube locking pins secur-
ing the static wire. See Figure 7A.
10.
Lock the nozzle to the swivel tube by
rotating the nozzle noting the alignment
marks. See Figure 7B.
11.
Adjust throttle assembly for best operator
comfort and tighten two socket-head
screws.
IMPORTANT!
Blower tube installation affects blower
performance! Make sure the tubes and
nozzle are correctly assembled per above,
and that all connections are tight. Blower
tubes may come apart during use unless
tubes are aligned and locked into place.

WARNING!

Danger from rotating
impeller!
Stop the engine before installing or
removing the blower tubes! Never
perform any maintenance or assem-
bly procedures on this unit while the
engine is running!
The blower should now be ready
for use.
Throttle
Assembly
Swivel
Tube
Throttle Cable
Holder
Static Wire
Static Wire
Connector
Figure 5
Loops
Figure 6A
Fold Wire
A
Lock Pin
Lock Slot
Flexible Tube
B
Figure 7
Figure 6B
Align the lock pins with the lock
slots, and push the tube and
nozzle together.
Rotate clockwise to lock making
sure the 3 lines are aligned on
both tube and nozzle.
Throttle Cable Holder
7

Advertisement

Table of Contents
loading

Table of Contents