Final System Setup - Trane YSC060 Installation Operation & Maintenance

Packaged gas/electric
Table of Contents

Advertisement

RT-SVX31A-EN

Final System Setup

Final System Setup
After completing all of the pre-start and
start-up procedures outlined in the
previous sections (i.e., operating the
unit in each of its Modes through all
available stages of cooling & heating),
perform these final checks before leav-
ing the unit:
[ ] Program the Night Setback (NSB)
panel (if applicable) for proper un-
occupied operation. Refer to the
programming instructions for the
specific panel.
[ ] Verify that the Remote panel "Sys-
tem" selection switch, "Fan" selec-
tion switch, and "Zone Temperature"
settings for automatic operation are
correct.
[ ] Inspect the unit for misplaced tools,
hardware, and debris.
[ ] Verify that all exterior panels includ-
ing the control panel doors and con-
denser grilles are secured in place.
[ ] Close the main disconnect switch or
circuit protector switch that provides
the supply power to the unit's termi-
nal block or the unit mounted dis-
connect switch.
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ysc120Ysc060adYsc072adYsc090adYsc102adYsc120ad

Table of Contents