Step 1 Unpack The Motherboard; Avoid Electro-Static Discharge (Esd) - American Megatrends Olympus III User Manual

American megatrends motherboard
Table of Contents

Advertisement

Step 1 Unpack the Motherboard

Step
Action
1
Inspect the cardboard carton for obvious damage. If damaged, call 770-246-8600. Leave the motherboard in
its original packing.
2
Perform all unpacking and installation procedures on a ground-connected anti-static mat. Wear an anti-static
wristband grounded at the same point as the anti-static mat. Or use a sheet of conductive aluminum foil
grounded through a 1-megohm resistor instead of the anti-static mat. Similarly, a strip of conductive
aluminum foil wrapped around the wrist and grounded through a 1 megaohm resistor serves the same
purpose as the wristband.
3
Inside the carton, the motherboard is packed in an anti-static bag, and sandwiched between sheets of
packaging sponge. Remove the sponge and the anti-static bag. Place the motherboard on a grounded
anti-static surface component side up. Save the original packing material.
4
Inspect the motherboard for damage. Do not apply power to the motherboard if it has been damaged.
5
If the motherboard is undamaged, it is ready to be installed.

Avoid Electro-Static Discharge (ESD)

Electro-Static Discharge (ESD) will damage the motherboard and other system
components. Keep the motherboard in the anti-static bag until it is to be installed.
Wear an anti-static wrist-grounding strap before handling the motherboard. Make sure
you stand on an anti-static mat when handling the motherboard.
Avoid contact with any component or connector on any adapter card, printed circuit
board, or memory module. Handle these components by the mounting bracket.
Chapter Two : Hardware Installation 13

Advertisement

Table of Contents
loading

Table of Contents