Chapter 5: Preparing Your Machine For Operation; Overview; Assembly Of Minor Components; Drill Chuck And Arbor - Smithy GRANITE 1300 SERIES Operator's Manual

Combination lathe/mill/drill
Table of Contents

Advertisement

Preparing Your Machine
5
For Operation

Overview

The Quick-Start Manual you received before delivery of your Smithy machine
provides detailed instructions for mounting and locating your machine. Please
complete those instructions if you have not already done so. As you unpack, it
is a good idea to inventory the parts. (See chapter 3 for a complete list.) Before
operating your machine, you should assemble the remaining components of
your machine, clean the machine, and lubricate it. This section will guide you
through those steps.

Assembly of Minor Components

The installation of the drill chuck, arbor and arbor plug; mill spindle covers; and several
handles should be completed according to the procedures described below.

Drill Chuck and Arbor

Before proceeding both the arbor and the chuck should be thoroughly cleaned to ensure
a good fit. Once cleaned attach the chucks to the respective arbors. Follow the steps
below to achieve the best possible fit.
Step 1: Place the arbor in a freezer for about 1 hour to slightly shrink the metal.
Step 2: Remove the cold arbor from the freezer and place it into the drill chuck.
Step 3: Use a soft mallet or a block of wood to tap the end of the arbor.
Step 4: Allow the arbor to return to room temperature.
5-1
Chuck
Figure 5.1 Installing Arbor into Chuck
For Assistance: Call Toll Free 1-800-476-4849
Jacobs Taper
MT3 Arbor

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents