Installation; Unpack & Prepare The Boiler; Install The Flue - Potterton Suprima 30 Installation And Service Instructions Manual

Wall mounter fan assisted balanced flue gas boiler
Table of Contents

Advertisement

2. Installation - Page 16
2.1
Unpack & Prepare the Boiler
These instructions assume you have decided on
where the boiler will be located and the type of flue
system to be used.
1.
Carefully unpack the boiler.
2.
Do not discard any packaging until all the items
are accounted for.
3.
Open the controls cover, remove the securing
screw and washer, pull off the controls cover
and put safely aside.
4.
Remove two screws and washers, remove the
white front case and put safely aside.
5.
Place the mounting template in the proposed
boiler position ensuring that it is level. Minimum
clearances are accounted for on the template.
6.
Mark the flue hole, remove the template and
carefully cut the flue hole through the wall. See
fig.8 for Side Flue.
7.
Place the mounting template centrally over the
hole (ensure the template is level) and mark out
the two screw fixing hole positions.
8.
Remove the template and drill the two holes
using a 7mm drill.
9.
Insert wall plugs and secure the mounting
bracket to the wall using two No. 12 x 2"
woodscrews.
10.
Lift the boiler onto the mounting bracket, slide
both boiler securing clips over the mounting
bracket (this prevents the boiler from being
accidently lifted off the the mounting bracket),
see fig.7.
11.
The third screw provided is also to prevent the
boiler from being lifted off the mounting bracket,
once the boiler is mounted on the wall. This
screw can be replaced by an anti-theft kit see
note below.
Note: There is provision for an anti-theft securing
point (sales code: SUPKITP) which may be used if
required.
2.2

Install the Flue

Maximum flue lengths are as follows:
30 - 70 Models
-
80 Model
-
These instructions are for rear and side flue
applications.
Rear Flue
1. Measure the wall thickness and add 66mm (or
106mm for installations using the System Boiler or
Stand Off Kits).
Side Flue
1. Determine the X dimension (wall thickness +
distance to boiler centreline).
For both Rear & Side Flues
2. Extend the telescopic flue to the required length,
minimum 20mm overlap.
3. Drill through the pilot hole and secure with self
tapping screw.
3.4M
2.4M

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Suprima 80Suprima 40Suprima 50Suprima 70Suprima 60 he

Table of Contents