Potterton Suprima 30 Installation And Service Instructions Manual page 17

Wall mounter fan assisted balanced flue gas boiler
Table of Contents

Advertisement

Installation - Page 17
4.
Wrap tape around the joint on the outer duct
to seal the flue, slide drip ring into a position
to coincide with the air gap in the wall (cavity
wall).
5.
Slide the flue through the hole until it stops on
the pin.
6.
The boiler is supplied with the flue elbow set
to the rear. For side outlet slacken the
screws and turn the elbow to the required
position and re-tighten screws. Ensure that
the seals are still correctly located.
7.
Hang the boiler onto the mounting bracket.
To square the boiler to the wall adjust the
boiler alignment screws on the back panel of
the boiler.
8.
Slide the flue back until it engages in the
elbow bayonet connection, twist anti-
clockwise to lock.
9.
Drill through pilot hole and lock flue in position
with the self tapping screw provided.
10 Make good the wall around the flue, both
outside and inside.
For extension kits refer to page 12 & 13. If a
Horizontal Extension is required this MUST be
combined with a Standard Flue as shown below in
the Maximum Flue Length Guide.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Suprima 80Suprima 40Suprima 50Suprima 70Suprima 60 he

Table of Contents