Apply the thermal grease to the top of the processor in the following pattern.
6.
Install the heatsink, and then close the heatsink retaining levers.
7.
Install the air baffle.
8.
Install the access panel (on page 24).
9.
Do one of the following:
10.
For tower models, return the server to an upright position.
o
For rack models, slide the server back into the rack.
o
Connect each power cord to the server.
11.
Connect each power cord to the power source.
12.
Press the Power On/Standby button.
13.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
Do one of the following:
14.
For tower models, install the bezel.
o
For rack models, if removed, install the security bezel (on page 21).
o
Hardware options installation 58