Mowing; Bagger Removal For Side Discharge - Exmark Laser Z Ultra Vac Operator's & Parts Manual

Hide thumbs Also See for Laser Z Ultra Vac:
Table of Contents

Advertisement

1. Read the operator's manual for your mower and familiarize yourself with all controls before
operating the machine. Make sure that you understand the controls, their locations, their
functions, and their safety requirements.
2. Ensure the blower, belt cover, bags, tube and hood are in good condition, properly
attached, and latched.

4.2 MOWING

1. The Ultra Vac blower operates when deck drive is engaged. Be sure that all persons are
clear of the mower deck and blower before engaging the cutting blades. Set the throttle
to "midway" position. Pull outward on the PTO switch to the "ROTATE" position.
Accelerate to full throttle to begin mowing.
2. To disengage the deck drive and blower, set the throttle to "midway" position. Push in on
the PTO switch to the "STOP" position to stop the cutting blades and blower. The cutting
blades will require a slightly longer amount of time to come to a complete stop when the
blower is installed on the deck.
3. To remove the bags, shut off deck drive, stop the engine and wait for all moving parts to
stop. Open the hood and remove the bags by lifting up on the rear of the bag, then
unhooking the front clip. Empty bags by inverting them.
4. Reinstall bags, close and latch the hood before continuing mowing.

4.3 BAGGER REMOVAL FOR SIDE DISCHARGE:

1. Shut off the deck drive, stop engine and wait for all moving parts to stop. Remove key.
2. Remove the discharge tube by releasing the latch at the blower. Slide the tube off the
blower outlet and remove the upper end from the hood.
3. Remove the Belt cover by loosening the knobs. For 60" units the outboard knob does not
need to be removed completely to remove the belt cover.
POTENTIAL HAZARD
♦ The deck sheave will become very hot
WHAT CAN HAPPEN
♦ Touching a hot deck sheave can cause severe burns.
HOW TO AVOID THE HAZARD
♦ Allow the deck sheave to cool completely before
removing the belt.
4. Pull the idler release handle and remove the belt from the upper groove of the deck
sheave.
5. Unlatch the front end of the blower. Pivot the blower back and lift it off the deck.
6. Install the discharge chute using the chute pivot pin and hairpin (see figure 11).
CAUTION
22
20
21
FIGURE 11
DISCHARGE CHUTE INSTALLATION

Advertisement

Table of Contents
loading

Table of Contents