Upflow Applications - Bryant 350MAV Installation, Start-Up, And Operating Instructions Manual

Series d deluxe 4-way multipoise fixed-capacity direct-vent condensing gas furnace
Table of Contents

Advertisement

BLOWER SHELF
ALTERNATE DRAIN
TUBE LOCATION
CONDENSATE TRAP
DRAIN TUBE LOCATION

UPFLOW APPLICATIONS

and also by a color label on each tube. These tubes are
identified as follows: collector box drain tube (blue label),
inducer housing drain tube (violet label or molded), relief
port tube (green label), and pressure switch tube (pink
label).
2. Condensate Trap Drain Tube
The condensate trap drain connection must be extended for
field attachment by doing the following:
a. Determine location of field drain connection. (See Fig. 2
or 5.)
NOTE: If internal filter is used, drain tube should be located to
opposite side of casing of return duct attachment to assist in filter
removal.
b. Remove and discard casing drain hole plug button from
desired side.
c. Install drain tube coupling grommet (factory-supplied in
loose parts bag) in selected casing hole.
d. Slide drain tube coupling (factory-supplied in loose parts
bag) through grommet ensuring long end of coupling
faces blower.
e. Cement 2 factory-supplied 1/2-in. street CPVC elbows to
the rigid drain tube connection on the condensate trap.
(See Fig. 5.) These elbows must be cemented together
and cemented to condensate trap drain connection.
NOTE: Failure to use CPVC elbows may allow drain to kink and
prevent draining.
FURNACE
DOOR
CONDENSATE
TRAP (INSIDE)
FIELD
DRAIN
CONN
SIDE VIEW
DOWNFLOW AND ALTERNATE
EXTERNAL UPFLOW APPLICATIONS
SLOT FOR SCREW
HORIZONTAL
APPLICATION
(OPTIONAL)
1 2
1
3 4
3 4
1
WIRE TIE
GUIDES
(WHEN USED)
FRONT VIEW
Fig. 4—Condensate Trap
CONDENSATE
TRAP
FURNACE
SIDE
7 8
4
1 4
1 2
26
1
FRONT VIEW
1
4
COLLECTOR BOX TO
TRAP RELIEF PORT
1
2
INDUCER HOUSING
DRAIN CONNECTION
5
8
COLLECTOR BOX
DRAIN CONNECTION
1 8
7
SCREW HOLE FOR
UPFLOW OR DOWN-
FLOW APPLICATIONS
7 8
(OPTIONAL)
1 4
1
2
2
SIDE VIEW
f. Connect larger diameter drain tube and clamp (factory-
supplied in loose parts bag) to condensate trap and clamp
securely.
g. Route tube to coupling and cut to appropriate length.
h. Attach tube to coupling and clamp securely.
C. Condensate Trap Location (Alternate Upflow
Orientation)
An alternate location for the condensate trap is the left-hand side
of casing. (See Fig. 2 and 6.)
NOTE: If the alternate left-hand side of casing location is used,
the factory-connected drain and relief port tubes must be discon-
nected and modified for attachment. See Condensate Trap Tubing
(Alternate Upflow Orientation) section for tubing attachment.
To relocate condensate trap to the left-hand side, perform the
following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs
inward and rotating trap.
3. Remove casing hole filler cap from casing hole. (See Fig. 2
or 6.)
4. Install casing hole filler cap into blower shelf hole where
trap was removed.
5. Install condensate trap into left-hand side casing hole by
inserting tube connection stubs through casing hole and
rotating until tabs snap into locking position.
—5—
FURNACE
DOOR
4
3 4
5
1 4
26
FIELD
DRAIN
CONN
END VIEW
HORIZONTAL
APPLICATIONS
OD
OD
OD
-IN. PVC OR CPVC
FURNACE
SIDE
3 4
5
4
3 4
FRONT VIEW
A93026

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents