Installing A Capacitor Pack - HP ProLiant BL620c G7 User Manual

Hide thumbs Also See for ProLiant BL620c G7:
Table of Contents

Advertisement

Install the cache module.
6.
Install the capacitor pack
7.
Install the server blade
8.
Power up the server blade (on page 14).
9.

Installing a capacitor pack

CAUTION:
remove the battery pack while an array capacity expansion, RAID level migration, or stripe size
migration is in progress.
CAUTION:
LED before unplugging the cable from the cache module. If the amber LED blinks after 15
seconds, do not remove the cable from the cache module. The cache module is backing up data,
and data is lost if the cable is detached.
IMPORTANT:
error message is displayed when the server blade is powered up, indicating that the battery pack
is temporarily disabled. No action is necessary on your part. The internal circuitry automatically
recharges the batteries and enables the battery pack. This process might take up to four hours.
During this time, the cache module functions properly, but without the performance advantage of
the battery pack.
To install the component:
Close all applications, and power down the server blade (on page 14). This procedure flushes all data
1.
from the cache.
Remove the server blade (on page 15).
2.
Remove the access panel (on page 16).
3.
Install the cache module
4.
Connect the cable to the battery.
5.
("Installing a cache
("Installing a server
To prevent a server blade malfunction or damage to the equipment, do not add or
After the server blade is powered down, wait 15 seconds and then check the amber
The battery pack might have a low charge when installed. In this case, a POST
("Installing a cache
module" on page 51).
blade" on page 28).
module" on page 51).
Hardware options installation 53

Advertisement

Table of Contents
loading

Table of Contents