Unpacking The Box - Cisco SOHO 71 Installation Manual

806 router and soho 71 router hardware
Table of Contents

Advertisement

Preparing for Installation
Caution

Unpacking the Box

Step 1
Step 2
Step 3
Step 4
Cisco 806 Router and SOHO 71 Router Hardware Installation Guide
2-4
Periodically check the resistance value of the antistatic strap, which should be
between 1 and 10 megohms (Mohms).
Table 2-1
lists the items that come with your router. All these items are in the
accessory kit that is inside the box that your router came in. If any of the items is
missing or damaged, contact your customer service representative.
Table 2-1
Router Box Contents
Power cord (black)
Desktop power supply
Console cable, RJ-45-to-DB-9
Two Ethernet cables (yellow)
Product documentation
To prepare for installation, follow these steps:
Obtain a broadband or Ethernet connection from your service provider.
Remove the yellow Ethernet cables, light blue console cable, and product
documentation from the Open Me First bag. Remove the desktop power supply
and the black power cord from the accessory kit. Gather the Ethernet devices to
be connected to the router: hub, servers, workstations, or PCs.
If you plan to configure the software using IOS commands via the console port,
provide a terminal or PC to connect to the console port.
If you plan to use the cable-lock feature, provide a Kensington or equivalent
locking cable.
Chapter 2
Installation
78-10432-04

Advertisement

Table of Contents
loading

This manual is also suitable for:

806

Table of Contents