Weil-McLain SlimFit Manual page 11

Commercial condensing gas-fired water boilers
Hide thumbs Also See for SlimFit:
Table of Contents

Advertisement

SlimFit
commercial condensing gas
Prepare boiler
Cold weather handling
in a very cold location (below 32°F) before installation,
handle with care until the pl
room temperature.
The boiler is heavy
the boiler or cause bodily injury while lifting and
handling.
Boiler supply, return and gas pipes
not lift or handle the boiler by the water or gas pipes.
Do not push on or apply weight to the pipes. Severe
damage can be done to the boiler.
plastic covers
Leave the
flanges and on the boiler vent and air adapters until
ready to attach piping. This will protect the flanges
surfaces from damage and prevent debris from falling
into the vent or air adapter.
Uncrating the boiler
Do not drop the boiler. Damage to boiler components
can result. Leave the boiler on the crate pallet until
ready to place in final location. Follow all uncrating
instructions.
Failure to comply could result in severe personal injury,
death or substantial property damage.
Figure 8
SlimtFit boiler on pallet, with ramp in position
Apply pressure only to jacket
corners when moving
Pallet
Part number 550-100-116/0713
-
(continued)
— If boiler has been stored
astic components come to
. Use caution not to drop
— Do
on the supply and return
Brackets
fired water boiler
1. See Figure 8 for the following.
2. Move the crate to a solid, level surface.
3. There must be room at the piping end to place the ramp and roll
the boiler down off the the crate pallet.
4. Make sure the crate is sitting securely.
5. Remove outer cardboard covering.
6. Remove the ramp from the crate and place the end of the ramp
into the notch in the pallet as shown in Figure 8.
7. Follow the uncrating instruction label to secure the ramp to the
pallet.
8. Remove the sheet metal screws and lag bolts from the six shipping
brackets. Remove and discard the shipping brackets. Re-insert the
upper screws into the holes in the boiler frame for best appearance.
Moving/handling the boiler
When moving the boiler, apply pressure ONLY
at the jacket corner posts
DO NOT
late the boiler.
Failure to comply could damage the boiler heat ex-
changer or other components.
Sheet metal
screws
Lag bolts
— Boiler Manual
.
use the piping or other extensions to manipu-
Ramp
11